î Structural design of Saman Bank Central Building in Mashad

20 MAY 2006 - Together with Mr. Monfared (architect) and Mr. Mahmoodian (civil engineer), structural design of Saman Bank Central Building has been finished. It took 45 days from beginning to delivery of For Construction drawings . Area of this building is 4750 sqm in 11 stories. Moment resistant steel frames have been used to resist against lateral loads of earthquake.

î Piping and drainage control of Shooroo Dam

03 JAN 2006 - Shooroo earth dam is located in Sistan province in eastern-south of Iran. According to feasibility studies of this dam, drainage discharge was low and no piping potential was detected. After the detail geotechnical investigations of the site, some doubts for piping raised (because of high permeability of the loose Silty-Sand of upper layer). Mr. Ali Saleh from Kankash Omran Consulting Engineers asked me to have a study on this case. After some studies and seepage modeling, I prepared a report for technical and economical comparison between the cut-off and downstream blanket solution.

î Structural design of Bam Kudakstan building for M.P.A. Williams

14 OCT 2005 - Two years after the devastating earthquake in Bam, Iran, that took more than 30,000 lives, left some 80,000 people homeless and reduced the city to rubble and dust, the well-being of the children of the city is the government’s top priority.
Mr. Paul Williams has decided to build a new kindergarten for children of Bam and I was honored to participate in this project for structural analysis and design... (Read more)

î Structural design of entrance gate for Mihan Dairy Company

20 SEP 2005 - Mihan Dairy Company is one the famous dairy companies in Iran. One of my friends, Mr. Majid Oman – Future Technics Company - is now in charge of architectural design and construction of factory renewal project. He asked me to design the main gate structure which has a huge cantilever element!... (Read more...)

î Design and supervision for groundwater drainage system of Mosalla in Tabriz

24 AUG 2005 - To decrease the ground water level in grand Mosalla of Tabriz, a drainage system had been designed by me (on contract for Kuban-Kav Consulting Engineers – Dr. Hormoz Family in 2003 and construction started by Pey-Eskan-Azar Company.
Construction of the system had been finished in May 2005 and according to discharge monitoring conducted by the contractor, client asked for a pump station to discharge the drained water out of the site. Pump station have been designed in civil, mechanical and electrical disciplines… (Read more...)

î Excavation slope stability recommendations for pump station in Gachsaran


20 JUL 2005 - To construct a concrete underground structure for Imamzadeh Jafar pump station located in Gachsaran, the contractor has excavated a deep excavation in gypsum, below the groundwater level. After finishing the excavation, water not only made a mud pool at the bottom of the trench, but also endangered the stability of the trench slopes.
Zoomar Consulting Engineers as the construction supervisor of the project invited me to solve their problem in July 2005. I had a short site visit and reported the required recommendations.

î Design of Maloo earth dam in north-east of Iran

11 JUL 2005 - Maloo earth dam is going to be constructed in Khorasan, north-east of Iran. Technical and economical studies have shown that crest would have 22m height and about 230m length. I engaged in this project as dam body designer in option study and detailed design stage collaborating with Kankash-Omran Consulting Company (Mr. Ali Saleh).